Facebook to build its first data centre in Asia with $1bn Singapore project

By Ben Mouncer
Facebook is to open its first Asian data centre in Singapore at an estimated cost of $1bn. The 11-storey site will be located in Tanjong Kling in the w...

Facebook is to open its first Asian data centre in Singapore at an estimated cost of $1bn.

The 11-storey site will be located in Tanjong Kling in the western part of Singapore, an area formerly known as Data Centre Park. Google operates one of its major data centres, an $850mn site, closeby.

Facebook's new base will be its first in the region, with it having previously leased storage space for its operations in Asia. The social media giant operates 15 data centres worldwide in the United States, Ireland and Sweden, with construction also currently underway at a site in Denmark.

See also:

Its Singapore space will be spread over 170,000sqm and will be the first to feature the SlatePoint Liquid Cooling system Facebook has developed in conjunction with Nortek Air Solutions.

Thomas Furlong, Facebook's vice president of infrastructure data centres, gave a press conference in Singapore to reveal the news. He promised that, during the construction phase, the project will generate "thousands" of jobs while "hundreds" of workers will be required to maintain the facility once it's up and running.

Singapore's Minister for Trade and Industry Chan Chun Sing described the news as a "significant milestone" for the region, indicating that Facebook's investment was indicative of Singapore's ability to "transcend" its historic constraints.

The data centre is expected to be operational by 2022 at a 30MW capacity, with the size and scope of the project set to significantly expand in the years thereafter.

Share

Featured Articles

Exec Q&A: Alex Cruz-Farmer, Cisco ThousandEyes

Alex Cruz-Farmer, Principal Product Manager at Cisco ThousandEyes, explains how their technology brings new levels of visibility to hidden DX issues.

Cloud & 5G - Day 2 highlights from the in-person stage

TECH LIVE LONDON returned to the Tobacco Dock last week. Stage host and Technology Magazine Editor in Chief, Alex Tuck, breaks down the presentations

Cloud & 5G - Day 1 highlights from the in-person stage

TECH LIVE LONDON returned to the Tobacco Dock last week. The stage host and Technology Magazine Editor in Chief, Alex Tuck, discusses the key themes

TECH LIVE LONDON: Day 2 highlights of the hybrid tech show

Digital Transformation

TECH LIVE LONDON: An overview of the hybrid technology show

Digital Transformation

TECH LIVE LONDON: Begins tomorrow at 10am!

Digital Transformation